Coal Yard Expansion for High Sulfur Coal

A new 32,000 ton high sulfur coal stockpiling and reclaim system was added to an existing coal yard to allow the client to segregate and stockpile low and high sulfur coals.

The project included the following:

As part of the project a new PLC based control system with redundant processors and fiber communications replaced the existing hard-wired controls for the entire coal handling system.

Varo performed the structural, mechanical, electrical, and controls engineering for the project, and furnished the equipment and structural steel as a supplier to the general contractor.

For more information regarding this project, please feel free to contact us at 614.459.0424.